Located just north of Mountain Lake, this project included building two new storage ponds, building a new building to operate on site, replacing and rerouting connecting piping, and reworking some parts of the old storage ponds and piping systems. It also included a unique perimeter drainage solution which required some creative crews to install the tile with a vertical sand drain above it to the surface.